During the planning process, we carefully analyzed the hydrological and hydraulic characteristics of the Liskur stream and assessed the current flood vulnerability of the area. Based on these findings, we developed a plan for constructing a dam and dry retention basin that will reduce the risk of floods and limit negative impacts on infrastructure