During the planning phase, we carefully analyzed the terrain and determined appropriate protective measures for the construction pit and excavations. We utilized jet grouting, which is a technique that strengthens the soil by injecting a high-pressure cement suspension. Additionally, we employed anchored piles that are securely embedded in the ground to provide additional stability. To safeguard against potential soil movements, we also constructed an anchored pile wall.